26223 Valley Point Ln,
Newhall, CA 91321
交易中 $850,000 ($85萬)
卧室: 4 浴室: 3 / 獨立屋
房屋信息

獨立屋

1844平方英呎
(171平方米)

8435 平方英呎
(784平方米)

1966 年

3

4 停車位

冷: CA

暖: CF

2024年03月20日
已上市 42 天

地產編號: SR24056384
所處郡縣: LA
面積單價:$460.95/sq.ft ($4,962 / 平方米)
家用電器:BIR,DW,GD,GR,GS,MW,RF,TW,WLR,WS
車位類型:GA
房屋簡介

Welcome Home to the City of Santa Clarita, area of Newhall, subdivision of Serena Park Estates, inside a cul-de-sac street, and with R2 Zoning can potentially build an ADU (buyer to verify). NO HOA, NO MELLO ROOS taxes, and OWNED Solar Panels 3500kW solar system and upgraded to 200amp main electrical service panel. True pride of ownership, owners have spent over $250k in repairs and improvements. In 2003: New Vinyl dual pane windows, front and rear entry doors, and 2 dual pane sliding doors. Replaced HVAC with new Lenox furnace and all new attic air ducts and attic insulation. In 2004: replaced landscape front and rear yards, new concrete driveway, patio decks and pool area, new block retaining walls and stone copping. Replastered pool and added a 400,000 Pentair BTU pool heater and filter. In the backyard added new vinyl fencing, irrigation, and landscape lighting. In 2007: upgraded the Kitchen with open floor plan to living room, stainless steel appliances, granite counter tops, and hardwood cabinets. Added built in whole house vacuum system and whole house attic fan. In 2008: replaced the pool pump with a variable speed motor. In 2010 installed a 3500kW solar system and upgraded to 200amp main electrical service panel. In 2011: installed a new tankless water heater. In 2012: installed a ceramic log fireplace. In 2014: Replaced AC condenser to a 5 ton condenser unit. In 2016: re-piped the interior water lines with PEX. In 2020: replaced garage concrete floor and installed a new insulated garage door. In 2021: upgraded the hall bath with fiberglass surround, glass shower door, new vanity and lighting, and ceramic tile floor. In 2022: remodeled the Master bedroom adding a walk in closet and a larger master bath with walk in shower, rain shower head, ceramic tile, and a new double vanity. Installed newer carpet throughout upstairs, newer laminate flooring in kitchen, living room and the family room. In 2023: performed a termite inspection, completed section 1 repairs as recommended, repaired the pool deck and concrete.

中文描述