290+ yards of clean soil brought in to backfill/level lot post FEMA cleanup, Private Hazard Tree Removal program/CAL OES Inspection Access Form submitted for ROE on 05.31.2020, New PG&E Temp Power Pedestal(All new cable installed during new undergrounding in 2019), New PID Backflow Device w/ potable water – installed 05.28.2020, New PG&E Gas Service Stub at Property Line(new PG&E gas main installed 2019), New working Septic passed Town Inspection on 06.29.2020 permit# OS20-01730, New Jensen 1500 gal Pre-Cast concrete Septic Tank – installed 06.26.2020 – Inspected/Passed 06.29.2020, New 4†Inlet 2-way Cleanout, new 4†inlet baffle T, new 4†outlet baffle T, new 4†ABS piping/fittings, new SealTight Risers/Lids, Existing Leach Field hydraulic tested w/ 300gal of pressurized constant water flow by Fletcher’s Plumbing 04.24.2020, Numerous tree stumps removed not ground down(will be hauled off by close of escrow), Old Poly Septic Tank(will be hauled to landfill by close of escrow).